Union Pacific RR will be doing crossing maintenance at the Scherrer Ave. RR crossing beginning June 26 at 8pm and continuing through June 28th at 5pm.
Union Pacific RR will be doing crossing maintenance at the Scherrer Ave. RR crossing beginning June 26 at 8pm and continuing through June 28th at 5pm.